Asset Information Handover

Asset information handover is the transition from project preparation records to operating asset records. It ensures that the evidence used to finance and build the asset does not disappear once operations begin.

Use this page before commissioning and early operations. It should identify which information containers become operating records in Atlas, who maintains them, and what reporting cycle applies.

Handover ItemSource ContainerOperating OwnerAtlas DestinationUpdate FrequencyStatus
Asset identity and boundaryProject profile, maps, site recordsREPLACE: OwnerProject and site recordWhen changedREPLACE: Status
Ownership and operating responsibilitiesGovernance chapter, contracts, handover recordREPLACE: OwnerStakeholder and role recordsWhen changedREPLACE: Status
As-built drawings and technical recordsDrawing register, commissioning packageREPLACE: OwnerTechnical recordWhen supersededREPLACE: Status
O&M plan and maintenance scheduleOperations and Maintenance chapterREPLACE: OwnerOperating planAnnual or when changedREPLACE: Status
Monitoring metrics and evidence rulesMetrics setup, safeguards register, operating planREPLACE: OwnerMetric assignments and evidence rulesReporting cycleREPLACE: Status
Clearances and compliance obligationsClearances tracker, permits, conditionsREPLACE: OwnerCompliance recordAs requiredREPLACE: Status
Risk controls and material-event triggersRisk register, safeguards registerREPLACE: OwnerRisk and material-event workflowQuarterly or event-basedREPLACE: Status
Financing and servicing assumptionsFinancial model, loan records, covenantsREPLACE: OwnerLoan and monitoring recordReporting cycleREPLACE: Status
  • Do not hand over only final narratives; hand over source records, evidence, responsibilities, and update obligations.
  • Mark superseded project assumptions so operating reviewers can distinguish planned values from actual performance.
  • Confirm that confidential files are classified before they are imported or linked in Atlas.
  • Assign an operating owner for every recurring update.
  • Record material-event triggers before the first operating reporting period.

Atlas should become the continuing operating record for the asset. The Project Information Model remains the project preparation record, while Atlas carries forward the information needed for monitoring, servicing, reporting, and note-level visibility.