The feasibility chapter records the studies, consultations, site visits, pilots, expert reviews, and prior work that shaped the project. It should make the path from idea to design visible.

Study Or ConsultationDatePreparer / SourceScopeKey FindingsProject Design ImplicationAtlas / Data Room LocationConfidence Level
[Study name][Date][Source][Scope][Findings][Implication][Location]Low / Medium / High
Evidence TypePurposeMinimum Standard
Site visit recordsConfirm physical context and constraints.Dated notes, photos, map references, and attendees.
Technical studiesTest design assumptions.Method, preparer, findings, limitations, and design response.
Stakeholder consultationsConfirm local participation and risk.Participant list, issues raised, response, and follow-up actions.
Pilot or operating dataValidate performance assumptions.Period, sample size, data quality, and relevance to scale-up.
Expert inputsStrengthen design and risk review.Expert identity, qualifications, recommendation, and sponsor response.

Sponsors must not present missing diligence as complete. Each unresolved item must have an owner, target date, financing relevance, and interim assumption.

GapWhy It MattersInterim AssumptionOwnerTarget DateFinancing Relevance
[Gap][Risk or decision affected][Assumption][Owner][Date]Condition / Covenant / Monitor
QuestionReviewer Test
Is the evidence recent and local enough?Confirm dates, geography, and project relevance.
Are third-party studies independent?Identify sponsor-prepared materials versus independent review.
Do findings flow into design?Trace each major finding to scope, cost, risk, or monitoring changes.
Are weak areas disclosed?Check gaps register and assumptions register.