This chapter defines quality controls for design, procurement, construction, commissioning, reporting, and evidence management.
Use Acceptance Criteria to define when information, works, tests, and handover records are ready for the next decision. Keep review states consistent with the Information Container Register so a reviewer can distinguish draft, reviewed, accepted, and superseded information.
| Quality Area | Standard or Requirement | Control Method | Owner |
|---|
| Design quality | REPLACE: Code, standard, sponsor requirement, or peer review | REPLACE: Review, approval, calculation check, drawing control | REPLACE: Owner |
| Procurement quality | REPLACE: Specification, evaluation standard, vendor qualification | REPLACE: Tender review, factory test, inspection, warranties | REPLACE: Owner |
| Construction or deployment quality | REPLACE: Workmanship, materials, installation, safeguards | REPLACE: Inspection test plan, hold points, site supervision | REPLACE: Owner |
| Commissioning quality | REPLACE: Performance tests, acceptance criteria, handover requirements | REPLACE: Testing, punch list, certificate, operator training | REPLACE: Owner |
| Evidence quality | REPLACE: Traceability, completeness, confidentiality, version control | REPLACE: Evidence register review, naming convention, approval workflow | REPLACE: Owner |
| Hold Point or Test | Acceptance Criteria | Evidence Required | Responsible Party | Status |
|---|
| REPLACE: Design review | REPLACE: Criteria | REPLACE: Review memo, signed drawing, calculation check | REPLACE: Party | REPLACE: Status |
| REPLACE: Materials or equipment inspection | REPLACE: Criteria | REPLACE: Certificate, photo, factory test, delivery note | REPLACE: Party | REPLACE: Status |
| REPLACE: Commissioning test | REPLACE: Criteria | REPLACE: Test result, certificate, operator sign-off | REPLACE: Party | REPLACE: Status |
| ID | Issue | Severity | Corrective Action | Owner | Closure Evidence |
|---|
| NCR-001 | REPLACE: Nonconformance or defect | REPLACE: Low, medium, high | REPLACE: Action | REPLACE: Owner | REPLACE: Evidence |
| NCR-002 | REPLACE: Nonconformance or defect | REPLACE: Severity | REPLACE: Action | REPLACE: Owner | REPLACE: Evidence |
| Asset Slot | Purpose | Suggested Path |
|---|
| Inspection test plan | Controlled plan for inspections, hold points, and acceptance tests. | appendices/quality/inspection-test-plan.pdf |
| Commissioning evidence | Test results, certificates, and punch list closure. | appendices/quality/commissioning/ |
| Quality photos | Photos documenting inspections or defects. | assets/photos/quality/ |
| Prompt | Expected Evidence | Owner | Status |
|---|
| Confirm quality responsibilities are included in contracts. | Contract clauses, quality plan, inspection test plan, or acceptance criteria. | REPLACE: Owner | REPLACE: Status |
| Confirm design and construction records are controlled. | Drawing register, revision log, approval workflow, or document control register. | REPLACE: Owner | REPLACE: Status |
| Confirm defects and corrective actions are tracked to closure. | Nonconformance register, photos, test result, or closure certificate. | REPLACE: Owner | REPLACE: Status |
| Confirm accepted information is not mixed with draft or superseded files. | Container register, review state, issue log, and acceptance record. | REPLACE: Owner | REPLACE: Status |