Skip to content

Information Requirements

Information requirements define the evidence, records, and decisions that must be present before a RICA Project Information Model can support financing review, project delivery, and later Atlas monitoring.

Use this page at the start of a project to decide what information is required, where it belongs, who is responsible, and what level of review is needed. The requirements should be updated when project scope, financing path, clearances, stakeholders, or operating assumptions change.

Requirement IDRequired InformationRelated ChapterOwnerReviewerEvidence LocationStatus
IR-001Project identity, sponsor authority, site, currency, and decision gate.Project ProfileREPLACE: OwnerREPLACE: Reviewerpim.yaml and 00-project-profile.mdREPLACE: Status
IR-002Location, boundary, land access, and site context.Project Profile / Project ScopeREPLACE: OwnerREPLACE: Reviewerassets/maps/ and evidence registerREPLACE: Status
IR-003Feasibility evidence for the preferred option.Feasibility EvidenceREPLACE: OwnerREPLACE: ReviewerFeasibility reports and evidence registerREPLACE: Status
IR-004Demand, supply, users, offtake, or service need.Demand, Supply, and OfftakeREPLACE: OwnerREPLACE: ReviewerMarket evidence, user records, agreementsREPLACE: Status
IR-005Technical design basis, drawings, quantities, and specifications.Engineering DesignREPLACE: OwnerREPLACE: Reviewerassets/drawings/ and technical notesREPLACE: Status
IR-006Governance, ownership, stakeholder, and community arrangements.Governance and OwnershipREPLACE: OwnerREPLACE: ReviewerAgreements, minutes, consent recordsREPLACE: Status
IR-007Financial model, assumptions, sources, and sensitivity cases.Financial ModelREPLACE: OwnerREPLACE: Reviewerdata/financial-model.xlsx and assumptions registerREPLACE: Status
IR-008Risk, mitigations, clearances, safeguards, and material open issues.Risk / Clearances / SafeguardsREPLACE: OwnerREPLACE: Reviewerdata/risk-register.csv, permits, safeguards recordsREPLACE: Status
IR-009Implementation, procurement, quality, commissioning, and handover records.Implementation / Procurement / Quality / O&MREPLACE: OwnerREPLACE: ReviewerWorkplan, contracts, test records, handover filesREPLACE: Status
IR-010Monitoring setup, operating metrics, and Atlas mapping.Operations and MaintenanceREPLACE: OwnerREPLACE: ReviewerMonitoring plan, metric definitions, Atlas fieldsREPLACE: Status

Start with the rows above, then add project-specific requirements. A protected cultivation project may need greenhouse design loads, irrigation water quality, crop plan, grower agreements, and offtake evidence. A social forestry project may need plot records, stewardship obligations, harvesting controls, and benefit-sharing evidence.

Each requirement should be specific enough that a reviewer can decide whether it has been met. Avoid vague requirements such as “market study complete” unless the expected evidence, reviewer, and decision use are clear.

Atlas can use the requirement register to show which project information is complete, which evidence is still missing, and which items are ready for financing review or operating handover. Keep requirement IDs stable once they are shared with reviewers.